TRAVEL NOTICE 6/29–7/18: HWY 217 between Hollister Ave and Sandspit Rd will be closed overnight (10 PM–6 AM) from Monday night through Saturday morning each week. Please use HWY 101/Fairview Ave exits or an alternate route. Project info

19358
ID
Sidewalk island in front of the SBA Terminal
Title

Terminal Sidewalk Repairs Begin November 12

Authored on
Body

Starting November 12, Santa Barbara Airport will be repairing two sidewalk areas near the Terminal. These improvements will take place in two phases along the island between the passenger drop-off lane and the short-term parking lot. During each phase, certain sidewalks and crosswalks may be closed. Travelers should follow the onsite signage for alternate walkways.

Phase 1: November 12-15
Sidewalk island between the historic Ovington Terminal drop-off lane and the short-term parking lot

Phase 2: November 18-22
Sidewalk island between the main Terminal entrance drop-off lane and the short-term parking lot

Please note that pick-up locations for taxis, rideshares, and shuttles may be temporarily relocated nearby. Signage will be provided onsite designating these locations.

Thank you for your patience as we work to make the sidewalks safer and more accessible for our passengers!

Aerial map of the terminal building designates locations of phase 1 and phase 2.