Project Information
Body

Santa Barbara Airport (SBA) is preparing a Climate Adaptation Plan that builds on the City of Santa Barbara Sea Level Rise Adaptation Plan prepared in 2021 and the Goleta Slough Area Sea Level Rise and Management Plan completed in 2015. The Climate Adaptation Plan will address the potential impacts of increased flooding due to future projected sea level rise and increased rainfall with climate change.

The first phase of the planning effort is a climate change and sea level rise hazards analysis and vulnerability assessment. This assessment will use an approach similar to the City of Santa Barbara Sea Level Rise Adaptation Plan, but will also incorporate the latest guidance from the Ocean Protection Council’s (OPC) draft 2024 State of California Sea Level Rise Guidance document. In the second phase, SBA will develop a Climate Adaptation Plan that identifies various strategies to reduce the potential future impacts of flooding and sea level rise at the Airport. In the third and final phase, the City will update its Airport and Goleta Slough Coastal Land Use Plan (LUP) to incorporate adaptation-related policies identified from the vulnerability assessment and adaptation plan. Throughout the phases of the study, public meetings and workshops will be held to provide opportunities for community engagement and input. 

Widgets

Project Plan

[ expand/close all ]

Public Meetings

Project Gallery

  • Cars parked at airport terminal in water
    Airport Flooding

    1969

  • Airport taxiway flooded
    Taxiway Flooding

    2024

  • Plane descending over San Pedro Creek
    Landing over San Pedro Creek

    2010

  • Flooding on airfield
    Flooding on Airfield

    1995

  • Los Carneros Creek
    Los Carneros Creek

    2024

  • Goleta Slough flooding
    Goleta Slough

    2014

  • Flooding at General Western Aero Hangars
    General Western Aero Hangars

    2023

  • Flooded Taxiway
    Flooded Taxiway

    1995

  • Maintenance working clearing Outfall 10 clogging
    Outfall 10

    2023

  • San Pedro Creek Flooding
    San Pedro Creek Flooding

    1941

  • Tecolotito Creek flooding
    Carneros Creek

    2023

  • Flooding on Firestone Road
    Firestone Road

    2024

  • Worker on flooded airfield
    Flooded Airfield

    2023

  • Flooded aircraft tie-down area
    Flooded Aircraft Tie-Down Area

    2023

  • Flooding at Airport Building 304
    Flooding at Airport Building

    2024

  • Goleta Slough Mouth
    Goleta Slough Mouth

    2014

  • Flooded taxiway
    Taxiway Flooding

    2023

  • Flooding at Goleta Slough
    Goleta Slough

    2014

  • Maintenance worker working in flooded area
    Water Pumping Operation

    2024

  • Airport Terminal and runways flooded
    Terminal Flooding

    1969

  • Runway Flooding
    Runway Flooding

    2023

  • Flooding at General Western Aero Hangars
    General Western Aero Hangars

    2023

  • Flooding at Moffet Place
    Moffet Place

    2010

  • Carneros Creek at capacity
    Tecolotito Creek

    2024

  • Cars in flooded parking lot
    Airport Building Flooded

    2008

  • Flooding at Outfall 10
    Outfall 10

    2023

  • Maintenance workers smiling knee deep in water on flooded airfield
    Water Pumping Operation

    2024

  • Rainbow above green field
    Rainbow After Storm

    2017

The Santa Barbara Airport does not discriminate on the basis of disability in admission to, access to, treatment of, or employment in its programs, services, and activities.