The Airfield lighting, signage, and marking project will upgrade the current airfield lighting to LED rename the designations to better reflect current FAA guidelines. The design stage of the project has been completed and construction is expected to begin in Fall 2023. 

Widgets
Exisiting Txy H
Name Designations

New name designations after construction. Does not include the Taxiway H extension project. 

Txy H design and future designations
Name Designations with Taxiway Hotel Project

New name designations after construction. Including the Taxiway Hotel project that will resume in 2024.