The Montecito Branch book drop will be closed May 3rd - 6th due to parking lot repaving

18477

Help shape the future of Santa Barbara's Waterfront! Respond to our survey at SantaBarbaraCA.gov/WaterfrontSurvey.
¡Ayúdanos a dar forma al futuro de la zona costera de Santa Bárbara! Responde a nuestra encuesta en SantaBarbaraCA.gov/WaterfrontSurvey.

18380

All SBPL locations will be closed on Tuesday, May 5, 2026 (5/5/26) for a staff training.

Eastside and Montecito Libraries will close at 2pm on Wednesday, May 6, 2026 (5/6/26) for a staff training.

18362
Banner
Title

Taxiway B "Bravo" Extension (formerly known as Taxiway H "Hotel")

Sidebar Widgets

Project Contact

Bradley Klinzing
Supervising Engineer 
(805) 692-6020
bklinzing@santabarbaraca.gov

Subtitle
Why this project?
Body

From the 2017 Master Plan, "To improve circulation efficiency and safety, Taxiway B is proposed to be extended to the Runway 7 threshold. This project will include the relocation of the glide slope antenna and the removal of excessive pavement near the intersection of Taxiway C and the runway to create a right‐angled access taxiway."

As part of the Airfield Marking, Signage, and Lighting Project that occurred in July 2024, Taxiway H "Hotel" was renamed to Taxiway B "Bravo". 

The project is currently in the design phase and estimated to begin construction by 2027. 

Widgets

Overview of Taxiway H "Hotel" extension and new name designations

Txy H design and future designations

The Santa Barbara Airport does not discriminate on the basis of disability in admission to, access to, treatment of, or employment in its programs, services, and activities.